Analyzing a production problem

Below-target component production was affecting final product assembly. In Gestão da Qualidade II (Quality Management II), my group and I analyzed this real problem at Bioproj to develop a practical process proposal.

Starting with a real problem

Gestão da Qualidade II (Quality Management II)

Production problem

Insufficient production was affecting final assembly. I worked with the group to analyze the situation presented by the company and develop a proposal.

Organizing the analysis

We used Ishikawa to discuss possible causes and Pareto to organize recurring issues. The analysis and proposal were collective work.

80.6% of the aggregated defect records are in the stain and failure categories.

Analysis of the dataset supplied for this portfolio.

Where the defect records are concentrated

  1. Stain49.3%
  2. Failure31.3%
  3. Flow10.8%
  4. Sink mark4.7%
  5. Finishing defect3.1%
  6. Weld line0.8%
Share of recorded defect categories · Jan–May 2026
Source and assumptions

Supplied spreadsheet, INJEÇÃO!K2:P39754. Sum of six defect fields; missing cells were not treated as observed zeros. This does not represent a scrap rate or unique defective parts. Visual summary prepared for the portfolio on Oct 13, 2026, without establishing a reduction in defects.

Formalizing the proposal

Group analysis

SOP proposal

Standard operating procedure

Application reported by the company

We delivered a group academic proposal; the company reported applying it successfully, without measurements of productivity or savings.

The available material does not allow the impact to be quantified or any stage to be attributed exclusively to me.

From analysis to proposal

We proposed a standard operating procedure to improve internal documentation and the organization of people and machines. Bioproj later told the group it had successfully applied the proposal. This feedback is qualitative: we did not measure increased production or reduced costs, and I do not claim sole authorship of any stage.

What I took from this experience

I learned to connect analysis, priorities and a proposal that could support day-to-day work. The company's feedback brought an application perspective to the academic assignment.